Mumbai
INR 6,000+ Cr
Resolved in 1-3 months
Large-Scale Infrastructure Redevelopment
One of Mumbai's largest mixed-use infrastructure mandates, involving a stalled multi-phase redevelopment, overleveraged lender stack and promoter-level credit deterioration.
Work included ring-fencing the viable asset, rebuilding cash-flow models, mapping security architecture and restructuring the capital stack to support completion.
Uttar Pradesh
Hospitality
45-47 days
Branded Hospitality & Distillery Mandate
Separated two assets into independently bankable propositions with dedicated models and lender-ready memoranda, matching each asset to suitable capital providers.
Gujarat
EV & Mobility
1-2 months
Clean Mobility Capital Advisory
Rebuilt the financing narrative around verified engineering revenue, mobility unit economics and a transparent, risk-adjusted framework for institutional review.
Noida NCR
Landmark FDI
40-47 days
Post-Pandemic Real Estate FDI
Engineered an FDI-compliant structure, built foreign-investor-grade documentation and bridged the trust gap between overseas capital and a domestic real-estate asset.
Madhya Pradesh
Ethanol
1-3 months
Greenfuel Project Finance
Converted a greenfield ethanol project into a bankable proposition through policy-linked modelling, secured-offtake assumptions and construction risk allocation.
Delhi NCR
EPC
1-2 months
Road Construction Working Capital
Mapped milestone payments against the cost-incurrence curve and structured a financing bridge for mobilisation, equipment and receivable timing needs.
Himachal Pradesh
Agri Logistics
2 months
Cold Storage Infrastructure
Positioned a hill-terrain cold-storage facility as essential post-harvest-loss-reduction infrastructure, supported by utilisation modelling and anchor-demand logic.
Rajasthan
Waste-to-Energy
2-3 months
Clean Energy Infrastructure
Structured financing around waste-supply and power-purchase economics, with a bankable dossier addressing feedstock, technology, offtake and compliance risks.